Projects and the brief
Make a project, write its brief and keep its files together.
A project keeps the files for one piece of work together: its personas, journeys, storyboards and experiences. Each project has a brief that says what the work is about. The brief opens the project's presentation, so a few answers go a long way.
Make a project
- In the Workspace, select New project in the side panel.
- Type a Name, and a Note on what the project is about and for whom.
- Pick a colour, then select Make the project.
The project opens. To make a file in it, select New ▾ in the Fusion bar and choose the kind of file. To bring in files you already have, select Add existing files….
To move a file from somewhere else, open the ⋯ menu on its card and select Move to a project…. Files that are not in a project stay in Drafts.
Find your way around the project page

- The project's name and note are at the top (1). The ⋯ button beside them has Rename, note, colour…, New sub-project…, Move into a project… and Delete project.
- Below it, the brief's overview (2): a banner with the project, the kind of work, the customer, the date and how many of the four essentials are answered, then a card for each part of the brief (the opportunity, who it's for, goals and success, scope, open questions, the plan). The pencil on a card opens the brief at that part. Hide the overview folds it to one line.
- Select Present (3) to make the project's presentation. See Present and export.
- The files are below, with a filter for each tool (4).
Deleting a project doesn't delete its files: they go back to Drafts.
Write the essentials
The brief is one page. The essentials come first: five fields, each with an example in it. Everything else is optional, and it saves as you go.
- On the project page, select Write the brief (or Edit the brief once there is one).
- Check the Name. It's the brief's title on the project page, in Figma and on the presentation's cover.
- Under What is the project, and why?, write a sentence or two (1). It becomes the headline of the project page and the presentation.
- Under Who is it for?, type the people the work is about, then press Enter. Your project's personas are suggested.
- Under What does success look like?, write one goal a line.
- Under When is it for?, pick the month, and say whether the date is fixed.
- Select Done (2). Closing the form any other way keeps what you wrote too.

Anything you don't know yet stays empty, and the brief strip reminds you how many essentials are left. The outline beside the form (a strip on top on a phone) has a dot for each part: it fills as the part fills. Select a part's name to jump to it.
Add more detail
The parts under Add more detail are optional. Select a part's heading to open it in place.
- Scope: the kind of work (pick the closest, or Something else and write it), why now, the background, how broad it is, what is in and out of scope, and What we'll make.
- Constraints and risks: what limits the work, and what you are assuming, with what happens if it's wrong.
- People and roles: the customer organisation, who asked, the sector and Who must see and agree. Select Add a person for each one.
- Research and evidence: the open questions, and how sure you are that it's wanted, can be built and is worth it (Desirable · Feasible · Viable).
- Impact: for when the work moves on. Mark each goal Not yet, Partly or Met, say how you'll know, write the result and add What we measured (what, before, after and the source).
- More options: the status (Draft or Confirmed), a picture for the brief, the project's number, who it's for in the organisation, its classification, and the import.
Undo and Redo are at the bottom of the form (⌘Z and ⇧⌘Z work too). Guide walks you through it: what and why, who it's for, success, the date, then the optional parts. Each step opens the part it talks about.
See the impact
The overview's Impact tab shows what the project changed, only from what exists:
- What changed: plain statements, such as "In the To-be of the passenger journey, we resolved 13 of 13 pains and lifted the feeling by 2.5 points". They come from the project's Journey Boards with a To-be, the goals' status and what you measured.
- Goals: where each goal stands, and how you said you'd know.
- From the journeys: each journey's change in figures: the feeling, the pains resolved, the steps with an issue.
- Measured outcomes: select Add a measure, type what was measured, before, after and the source, then Save the measures.
When there's something to show, the presentation has an impact page after "Where the project stands".
Keep track of open questions
- Open Research and evidence.
- Select Add a question and type it, or pick one under Ideas to start from.
- For each question, choose what it blocks (for example The persona or The timeline) and who to ask. Mark it Answered when it is.
The number of open questions shows on the brief strip and in the presentation.
Plan the deliverables
- Open Scope, then go to What we'll make.
- Switch on each deliverable the project will make. A deliverable that already has files shows how many are in the project, and is switched on for you. Something else? Type it in the box.
- Set its status: Proposed, Agreed or Done, and say why it matters to the customer.
Fill the brief from a file
If the Fusion skill made a brief for you, open More options in the brief form, select Import from a .fusion.json… and choose the file. Check what it filled in.